Wednesday, 15 June 2011
FINAL DRAWINGS
DETAIL 1 - SOIL NAILING |
DETAIL 2 - CORRUGATED METAL & COLUMN JOINT |
DETAIL 3 - JOINTS |
DETAIL 4 - JOGGING TRACK |
FINAL DRAWINGS
WEST ELEVATION |
SECTION |
SOUTH ELEVATION |
SECTION |
EAST ELEVATION |
SECTION |
FINAL DRAWINGS
SITE PLAN |
FIRST FLOOR PLAN |
GROUND FLOOR PLAN |
FINAL DRAWINGS
PERSPECTIVE FROM FRONT |
BIRD EYE VIEW |
PERSPECTIVE FROM REAR |
BAR VIEW |
SPORTS HALL |
GYM |
JOGGING TRACK |
MODEL DEVELOPMENT
For the final development, I made the jogging track and connected it with the site. I also put grasses in order to see the landscape of the model. In this model, i can see how the structure of the model working as a whole. It is very challenging to create this kind of model form.
Friday, 10 June 2011
MODEL DEVELOPMENT
The model is in its final condition with the jogging track and the site. Probably the site is not very accurate, but it can communicate the condition of the building with the context. Maybe, i will put greeneries for the finishing.
Wednesday, 1 June 2011
MODEL DEVELOPMENT
The sense of rigid appears as the structural skin becomes a dominant part of the building |
Full view from above |
Series of column which is holding the bar area |
The view from basketball court, structures joined together with the skin |
View of basketball court from above |
The bird view perspective |
View from south |
The connection of column and structural skin |
View from the football field |
The model development started from the 10th week. The structural skin is the first part of the building which I made. Every week, I came up making the first floor, second floor and other additional structure outside the building. There are couple of things to do to finish the model, which are the contours for the model's base and the jogging track.
Sunday, 15 May 2011
Thursday, 5 May 2011
DESIGN RELATION TO THE SITE
The access from the surrounding is described at the picture. The point to have this building at the site, is to connect different areas, and create shortcut, so that the HSW site can also be the core area to go from one to another area.
BUILDING BREAKDOWN
From the building, i breakdown it in order to communicate the design tectonic and the materials. The built area made to provide the activity of the sport center.
The first skin is the structural skin that made from steel. and create the sense of parasitic and stiffness of the building. The second skin, is the fulfilling materials for the structural skin. I put the glass in order to get daylighting from the site. The corrugated metal also used in order to give lighter weight to the structure while maintaining it into ventilation for the building.
SPACE VIEWS
My design intention is combining both stiffness dimension of sporting area into more likely to be active and fluid sensation. I tend to create people to experience height, just like the one i developed in my folie. The jogging track is the feature that become my parameter in this building. People can experience the new path for jog, while exploring the HSW area.
DESIGN PROPOSAL
Those are the perspectives i proposed for the design. In this design, i am trying to get its strong and active combination and make it grows out parasitically. The point parameter is that i am using the parasitic phase i developed my design intention for the sport center building, while creating active and fluid space for the people.
Subscribe to:
Posts (Atom)