Wednesday 15 June 2011

FINAL DRAWINGS

DETAIL 1 - SOIL NAILING
Looking through the tectonic feature of the building, i planned to use soil nailing in order to balance the force of the steel structure. It holds the steel structure by holding it with steel wire wraps with concrete.
DETAIL 2 - CORRUGATED METAL & COLUMN JOINT
 The use of corrugated metal is essential to generate circulation and natural lighting. I put it stacked, in order to prevent rainfall, while maintain it to create interesting sense of dynamic from the light penetration. The column which is made from concrete and H steel is joined by a metal plate which connected by bolts.

DETAIL 3 - JOINTS
This is the way to connect the steel plates for each edges of the structural skin. The use of big bolts will be very essential.

DETAIL 4 - JOGGING TRACK
The jogging track uses the structural skin as the base. The track is held by steel wire which is strong enough to create small amount of cantilever. In fact, the jogging track will be joined together as one so that it would not be broken when people used it. The jogging track kind of work like ring for the building, it is also strengthening the structural skin. 

No comments:

Post a Comment